Skip to content
ISO/IEC 17025:2017 Accredited Calibration Laboratory  ·  ISO 9001:2015 Certified  ·  DIFE Enlisted
Electrical Safety

Electrical Safety Testing Service in Bangladesh

Earth resistance, insulation resistance and thermography testing for panels, generators and distribution systems — the documented evidence your buyer and insurance audits expect.

Scope

What We Test

Earth & Insulation Resistance

Earth resistance and insulation resistance testing on panels, motors and installations.

Thermography Survey

Infrared thermal imaging of panels, breakers and connections to catch hot joints before failure.

Transformer Oil Testing

Dielectric and quality testing of transformer insulating oil.

Panel & DB Audit

Voltage, ampere and load audit of panels and distribution boards.

Lightning Protection

Lightning protection system continuity and earthing checks.

Why It Matters

Why This Testing Prevents Downtime, Not Just Fires

A loose connection or degrading insulation rarely announces itself before it causes an outage or a fire. A thermography survey and insulation resistance test catch these faults as measured, comparable numbers — not a subjective visual impression — giving your maintenance team a prioritised list instead of a guess.

What’s included

  • Calibrated test instruments, traceable results
  • Thermal images with severity ranking
  • Practical corrective recommendations
  • On-site, including shutdown windows

Questions

Electrical Safety Testing FAQs

How often should electrical safety testing be done?

Annually is common for general panels and installations, with more frequent thermography checks for heavily loaded or critical panels, per your maintenance and audit requirements.

Does a thermography survey require a shutdown?

No, thermography is normally done with the equipment live and under load, which is when hot joints and overloaded connections actually show up.

Will this satisfy a buyer or insurance audit?

Our reports include calibrated, traceable readings and photographic evidence with severity ranking — the documentation standard these audits expect.

Can this be combined with other inspection work?

Yes, electrical testing is often scheduled alongside our other NDT inspection services or DIFE load testing in the same visit.

Send us your equipment list today

We reply with a full scope, schedule and quotation within 24 hours — for a single instrument or a whole plant.